RC-01 Thunderbolt — LSM Cabinet Service

Launch track LSM cabinet service. Includes transfer track isolation and capacitor bank discharge. ASTM F770 maintenance.

12 isolation points · Bleed, Block, Disconnect, Switch, Valve
This is a worked example, not an approved procedure

It refers to equipment that does not exist and illustrates the elements 29 CFR 1910.147(c)(4)(ii) requires a procedure to contain. It is not a document to adopt. Under (c)(4)(i) the employer must develop and document energy control procedures specific to their own machines, and under (c)(6) must inspect them at least annually.

Energy isolation is not the whole job

Other standards also apply to this work

  • NFPA 70E — arc flash. Working on an energised-capable LSM cabinet requires shock and arc-flash boundary assessment and appropriate PPE.
The isolation plan

12 points, in sequence

Isolate & lock Isolated, locked and tagged as part of the isolation.
Apply & verify A physical state applied and then verified — not a lockable energy isolating device.
Must stay energised Deliberately left live. Removing this supply would create a hazard rather than remove one.
Not an isolation device Tagged for information. It does not isolate energy and must not be relied on as if it did.
10
RC-01-XFER-DRIVE Isolate & lock Disconnect

Transfer track drive disconnect. Upstream block - isolate so no train can be moved into the work zone.

20
RC-01-TRAIN-CHOCK Apply & verify Block

Train chocks fitted at the station and any occupied block. GRAVITY - a train on grade will roll.

30
RC-01-ANTIROLL Apply & verify Block

Anti-rollback dogs engaged on the lift. Prevents lift chain runback under load.

40
RC-01-MAIN Isolate & lock Disconnect

Ride main disconnect, 480V at the MCC. Feeds lift, brakes, control system and station.

50
RC-01-LSM-PWR Isolate & lock Disconnect

LSM launch drive disconnect. Feeds the linear synchronous motor cabinets along the launch track.

60
RC-01-LSM-CAP Isolate & lock Bleed

LSM capacitor bank discharge point. STORED ELECTRICAL - banks hold lethal charge after the drive is isolated.

70
RC-01-CDA Isolate & lock Valve

Compressed air supply at the ride header. Feeds brakes, restraints and transfer track.

80
RC-01-CDA-BLEED Isolate & lock Bleed

Air header bleed downstream of the supply valve. Confirm zero on the gauge.

90
RC-01-BRAKE-AIR Isolate & lock Valve

Block brake air supply. Brakes are SPRING-APPLIED and air-released - removing air sets the brakes.

100
RC-01-HYD-REST Isolate & lock Valve

Restraint hydraulic supply. Holds lap bar locking pressure; bleed before working on a restraint.

110
RC-01-EVAC-LIGHT Must stay energised Valve

Evacuation walkway and catwalk lighting. Must REMAIN ENERGISED while anyone is on the structure.

120
RC-01-CTRL-PLC Not an isolation device Switch

Ride control PLC and E-stop circuit. Control circuitry only - NOT an energy isolating device.

Deliberately incomplete

What your site must supply

This example is structurally complete and factually generic. The things below are the things only you can know — and they are exactly what makes a procedure yours.

  • Your own asset and isolation-point tag numbers. The tags shown are illustrative and refer to equipment that does not exist.
  • The actual location of every disconnect, valve and vent on your equipment.
  • Measured stored-energy magnitudes and the dwell time required to dissipate them.
  • Your verification method for each point, and who is authorised to perform it.
  • Any additional energy sources present on your equipment and absent here.

Author this properly, once

Setyr holds procedures like this as living documents — bound to real isolation points, with lock registries, group lockout, person-in-charge custody and periodic review built in.