★ Getting Started ★

From paper procedures
to protected workforce.

Our implementation process is structured to minimize disruption and maximize adoption — a clear path from your current procedures to fully digital LOTO, phase by phase.

Structured Implementation

Three phases to fully digital LOTO

01

Assessment & Planning

  • Current LOTO process audit
  • Equipment and energy source inventory
  • Regulatory compliance gap analysis
  • Implementation timeline and stakeholder plan
02

Configuration & Setup

  • Equipment database build-out
  • Procedure templates authored
  • User roles and site permissions
  • Document library integration
03

Training & Go-Live

  • Hands-on technician training
  • Supervisor dashboard onboarding
  • Pilot program with live feedback
  • Full production deployment and ongoing support
Why Choose Setyr

Industrial-specific. Not adapted — built.

Generic workflow tools can't handle the complexity of LOTO: multiple concurrent lockouts, group lock procedures, equipment with dozens of isolation points, and the legal requirements of OSHA 29 CFR 1910.147. Setyr is designed for exactly this.

Equipment-specific procedures, not generic templates
Group lockout and multi-technician workflows
OSHA 1910.147 compliance embedded in every step
Enterprise-wide visibility with site-level operations
Designed for technicians — not just safety managers

Contact Us

See how Setyr maps to your specific equipment and LOTO procedures. Personalized to your facility.

Get in touch

Platform Access

Already have an account? Access your enterprise or site portal directly.

Login to Platform

Support

A dedicated implementation team works with you through onboarding and go-live, with ongoing support for your deployment.

Start your implementation today

Move from paper LOTO to a digital system built to truly protect workers — with a clear, structured path to get there.