Setyr worked example — RIG-27 Rig Down for Relocation Not approved for use. Version 1 · 2026-09-04
Worked example only — your site must author, review and approve its own procedure under 29 CFR 1910.147(c)(4). setyr.com/procedures

RIG-27 Rig Down for Relocation

Drilling

Full rig de-energisation prior to rig down and move. Spans SCR house, drawworks, top drive, mud pump, BOP and mast. Multi-shift.

This is a worked example, not a procedure you can adopt. It describes equipment that does not exist, with illustrative tag numbers. 29 CFR 1910.147(c)(4) requires the employer to develop, document and utilise energy control procedures specific to their own machines, and (c)(6) requires the employer to inspect those procedures periodically. Neither duty can be delegated to a vendor or discharged by this document.
Other standards apply to this work.
  • API RP 54 — occupational safety for drilling operations.
A lockout-only document is misleading for work that also falls under another standard.

Isolation points

#Tag (illustrative)TypeDispositionWhat it does and whyDwell
10RIG-27-DW-BLOCKBlockApply & verifyTraveling block landed and secured in the mousehole. SUSPENDED LOAD removed before any brake work.
20RIG-27-MAST-HYDValveIsolate & lockMast raising hydraulic supply valve. Isolate before pinning.
30RIG-27-MAST-PINBlockApply & verifyMast raising cylinder locking pins. Fitted before ANY work near the mast. Removed last.
40RIG-27-GEN-MAINDisconnectIsolate & lockMain generator breaker at the SCR house. Isolates all rig power. Rig electrician only.
50RIG-27-SCR-BUSDisconnectIsolate & lockSCR DC bus disconnect. Feeds drawworks, mud pumps and rotary motors.
60RIG-27-SCR-GNDChainApply & verifySCR DC bus grounding cluster. Applied AFTER proving dead. Removed LAST before re-energising.
70RIG-27-DW-MOTORDisconnectIsolate & lockDrawworks DC motor disconnect at the SCR house.
80RIG-27-DW-BRAKEValveKEEP ENERGISEDDrawworks band brake air supply. Brake must remain APPLIED - do not bleed with load in the derrick.
90RIG-27-TD-PWRDisconnectIsolate & lockTop drive power disconnect. DC motor, isolate at the SCR house.
100RIG-27-TD-HYDValveIsolate & lockTop drive hydraulic supply to the pipe handler and torque wrench.
110RIG-27-TD-BLEEDBleedIsolate & lockTop drive hydraulic bleed. Trapped pressure remains in the pipe handler after supply isolation.
120RIG-27-MP1-PWRDisconnectIsolate & lockMud pump No.1 motor disconnect at the SCR house.
130RIG-27-MP1-SUCTValveIsolate & lockMud pump No.1 suction valve from the active pit.
140RIG-27-MP1-DAMPBleedIsolate & lockPulsation dampener bleed. STORED PRESSURE plus nitrogen precharge - bleed and confirm zero.
150RIG-27-BOP-ACCBleedIsolate & lockKoomey accumulator isolation and bleed. 3000 psi nitrogen-backed - largest stored energy on the rig. 300s
160RIG-27-BOP-AIRValveIsolate & lockBOP control air supply from the rig air system.
170RIG-27-GAS-DETValveKEEP ENERGISEDH2S and combustible gas detection. Must REMAIN RUNNING until the well is confirmed secure.
180RIG-27-EMG-LIGHTValveKEEP ENERGISEDRig emergency lighting circuit. Must REMAIN ENERGISED - night rig moves depend on it.

What your site must supply

  • Your own asset and isolation-point tag numbers. The tags shown are illustrative and refer to equipment that does not exist.
  • The actual location of every disconnect, valve and vent on your equipment.
  • Measured stored-energy magnitudes and the dwell time required to dissipate them.
  • Your verification method for each point, and who is authorised to perform it.
  • Any additional energy sources present on your equipment and absent here.

Authorship and validation

This example was authored by Setyr for domain validation. It is not derived from any customer's controlled documents. It illustrates the elements 29 CFR 1910.147(c)(4)(ii) requires a procedure to contain — it does not certify compliance, which is a property of an employer's programme rather than of any document.

Back to the web version