PE-2200 Etch Chamber A — Wet Clean Isolation

Full energy isolation of plasma etch chamber A for scheduled chamber wet clean. Cl2/BCl3 metal etch chemistry.

10 isolation points · Bleed, Disconnect, Valve
This is a worked example, not an approved procedure

It refers to equipment that does not exist and illustrates the elements 29 CFR 1910.147(c)(4)(ii) requires a procedure to contain. It is not a document to adopt. Under (c)(4)(i) the employer must develop and document energy control procedures specific to their own machines, and under (c)(6) must inspect them at least annually.

The isolation plan

10 points, in sequence

Isolate & lock Isolated, locked and tagged as part of the isolation.
10
ETCH-A-CL2-VMB Isolate & lock Valve

Chlorine (Cl2) process gas manual valve at the valve manifold box. TOXIC gas; purge required before break.

30
ETCH-A-BCL3-VMB Isolate & lock Valve

Boron trichloride (BCl3) manual valve at the valve manifold box. TOXIC/corrosive; purge required.

40
ETCH-A-N2-PURGE Isolate & lock Valve

N2 purge valve for process gas lines. Used DURING isolation to purge toxics; not isolated for the work.

60
ETCH-A-VAC-ISO Isolate & lock Valve

Chamber vacuum isolation valve to the roughing pump. Vacuum/pressure energy.

70
ETCH-A-RF-DISC Isolate & lock Disconnect

RF generator supply disconnect (13.56 MHz). Electrical + STORED capacitor energy; requires discharge dwell.

90
ETCH-A-MAIN-DISC Isolate & lock Disconnect

Tool main electrical disconnect, 480V 3ph at the facility panel. Electrical energy.

100
ETCH-A-CDA Isolate & lock Valve

Compressed dry air supply to pneumatic valves and wafer handler. Pneumatic energy.

110
ETCH-A-CDA-BLEED Isolate & lock Bleed

CDA bleed to atmosphere downstream of the supply valve. Relieves stored pneumatic pressure.

120
ETCH-A-PCW-SUP Isolate & lock Valve

Process cooling water supply to chuck and chamber walls. Hydraulic + thermal.

130
ETCH-A-PCW-RET Isolate & lock Valve

Process cooling water return. Hydraulic + thermal.

Deliberately incomplete

What your site must supply

This example is structurally complete and factually generic. The things below are the things only you can know — and they are exactly what makes a procedure yours.

  • Your own asset and isolation-point tag numbers. The tags shown are illustrative and refer to equipment that does not exist.
  • The actual location of every disconnect, valve and vent on your equipment.
  • Measured stored-energy magnitudes and the dwell time required to dissipate them.
  • Your verification method for each point, and who is authorised to perform it.
  • Any additional energy sources present on your equipment and absent here.